Abstract: The main objective of this project is to design and model a frame for SSED in order to carry Subsea equipment like Back pressure regulator-Skoflo, Meg filters and replace the damaged ones which are under a sea depth of 2km as per DNV guidelines. Analyze the static structural stability of the frame. Using SSED frame, the maintenance operational time can be reduced to 3-4 hours. Thus saving the loss of production costs. The equipment can be safely deployed into subsea unlike the conventional retrieval system.
Keywords: Subsea, SSED frame, operational time, retrieval system, stability, DNV guidelines.
Downloads:
|
DOI:
10.17148/IARJSET.2022.9446
[1] Kushal Deepak Bokam, Usha Kiran Beesetti, Veda Vyas Vasupalli, Sai Sudheer Chintala, Venkata Surya Vaddadi, Seeta Raghuram Kandregula, "Design and Modelling of Subsea skid for Equipment Deployment (SSED)," International Advanced Research Journal in Science, Engineering and Technology (IARJSET), DOI: IARJSET.2022.9446