📞 +91-7667918914 | ✉️ iarjset@gmail.com
International Advanced Research Journal in Science, Engineering and Technology
International Advanced Research Journal in Science, Engineering and Technology A Monthly Peer-Reviewed Multidisciplinary Journal
ISSN Online 2393-8021ISSN Print 2394-1588Since 2014
IARJSET aligns to the suggestive parameters by the latest University Grants Commission (UGC) for peer-reviewed journals, committed to promoting research excellence, ethical publishing practices, and a global scholarly impact.
← Back to Archives

Optimization of Scorpio front suspension (W105) assembly line by using ECRS Principles

Shubham Kothavade, S.P. Deshpande

👁 5 views📥 0 downloads
Share: 𝕏 f in
Abstract: In today's competitive manufacturing environment, companies are constantly looking for ways to improve in their production process. A new flow of assembly line is proposed for suspension assembly line. An assembly line of a Front Suspension of Mahindra Scorpio is to be optimized to increase the productivity. This paper presents the improvement of production rate and balance loss ratio of the manual assembly line. Using ECRS four principles (Eliminate, Combine, Rearrange and Simplify) minimize the idle time or the percentage of line balance loss. The result shows that cycle time of the assembly line is reduced from 56 seconds to 48 seconds and Production rate increased from 250 to 293 pieces per hour. Keywords: Assemble line, ECRS, work-study, balancing, optimization.

How to Cite:

[1] Shubham Kothavade, S.P. Deshpande, “Optimization of Scorpio front suspension (W105) assembly line by using ECRS Principles,” International Advanced Research Journal in Science, Engineering and Technology (IARJSET), DOI: 10.17148/IARJSET/ICAME.06

Creative Commons License This work is licensed under a Creative Commons Attribution 4.0 International License.