Studying Project Management System for Mumbai MetroDiesel
Downloads: Download PDF
👁 4 views📥 0 downloads
+91-7667918914 iarjset@gmail.com 0 Items International Advanced Research Journal in Science, Engineering and Technology
A Monthly Peer-Reviewed Multidisciplinary Journal ISSN Online 2393-8021 ISSN Print 2394-1588 Since 2014 Home
About About IARJSET Aims and Scope Editorial Board Editorial Policies Publication Ethics Publication Policies Indexing and Abstracting Citation Index License Information Authors How can I publish my paper? Instructions to Authors Benefits to Authors Why Publish in IARJSET Call for Papers Check my Paper status Publication Fee Details Publication Fee Mode FAQs Author Testimonials Reviewers
Topics
Peer Review
Current Issue & Archives
Indexing
FAQ’s
Contact Select Page ICACE-18 1 Abstract: As the city of Mumbai is undergoing tremendous infrastructural development and Mumbai Metro is going to be an iconic project being undertaken by the government. We intend to work on studying some important aspects of Construction Management such as Studying Project Management System, Risk and Value Analysis. Further we also intend to do a risk assessment and measures taken for risk mitigation of Mumbai metro and also the cost assessment and overheads caused due to delays and the measures taken to minimize the impact of such delays so that project is completed on scheduled time. As the project is under construction right now there would have been many such delays and steps would already have been taken to mitigate the impact of such delays caused due to unforeseen factors like rains. Mumbai Metro is a rapid transit system serving the city of Mumbai Maharashtra. The system is designed to reduce traffic congestion in the city, and supplement the overcrowded Mumbai suburban Railway network. It is being built in three phases over a 15-year period, with overall completion expected in2021. When completed, the core system will comprise eight high-capacity metro railway lines, spanning a total of 200 kilometers (120 mi) (20% underground, the rest elevated, with a minuscule portion built at-grade), and serviced by 169 stations. Keywords: EVM, CPM, EAC, NCC. Call for Papers Rapid Publication 24/7 April 2026 Submission: eMail paper now Notification: Immediate Publication: Immediately with eCertificates Frequency: Monthly Downloads Paper Format Copyright Form
Submit to iarjset@gmail.com or editor@iarjset.com Submit My Paper Author CenterHow can I publish my paper?
Publication Fee
Why Publish in IARJSET
Benefits to Authors
Guidelines to Authors
FAQs (Frequently Asked Questions)
Author Testimonials IARJSET ManagementAims and Scope
Call for Papers
Editorial Board
DOI and Crossref
Publication Ethics
Editorial Policies
Publication Policies
Subscription / Librarian
Conference Special Issue Info ArchivesCurrent Issue & Archives
Conference Special Issue Copyright © 2026 IARJSET This work is licensed under a Creative Commons Attribution 4.0 International License. Open chat
How to Cite:
[1] Umang Bhanushali, Ankit Prabhu, Parth Dagli, Smit Chheda, Mr. Arpit Vyas, “Studying Project Management System for Mumbai MetroDiesel,” International Advanced Research Journal in Science, Engineering and Technology (IARJSET)